남부솔루션

Railway Solution

KTCS-2/KTCS-3

Train Automatic Operation System Field Test Infrastructure Establishment and Verification

1. Construction of KTCS-3 Control Facility (CTC)

For KTCS-3 field tests and performance verification

  • Control facility design, production, and performance verification support
2. Design and Construction of Field Test Infrastructure

For KTCS-3 performance verification

  • Design and construction of ground test line infrastructure
  • Modification and verification support for test vehicles
3. Ground-Based Comprehensive Measurement (Monitoring) Equipment
  • Construction of track maps using design and trial run collected information
  • Recording and tracking of ground and vehicle data
  • Verified test devices for operation analysis
  • Formal report writing and output

Field Test of KTCS-3 Technology

  • Verification and enhancement of development specifications
    Speed increase of development objectives from 350 to 400 km/h
  • Field test of KTCS-3 prototypes
    Integrated test, high-speed test, field function test
  • Infrastructure establishment for field tests
    Interlocking device, control, modification of test vehicles
  • Stability evaluation
    SIL-4 safety certification
  • Field test of track circuit replacement technology
    Train separation/rail loss detection device

Securing KTCS-3 Suitability Evaluation Technology

  • Simulator for integrated ground/vehicle test
    Establishment of integrated test simulator
  • Establishment of certified test infrastructure
    Preparation of KOLAS certified test quality documents
    Preparation of KOLAS certified test technical documents
  • Establishment of integrated test procedures and standards
    Integrated test procedures
    KTCS-3 standard specifications (draft)

Upgrade of Train Automatic Operation Technology Specifications for KTCS-2

  • Field test and draft standard specifications for train automatic operation for KTCS-2
    Baseline 3 upgrade
    Safety analysis report
  • Test support from participating companies
    Participation in drafting draft standards
    Support for field test facilities

Korean Train Control System (KTCS) Technology Phases and Stepwise Control Methods

KTCS-1 (Operational)

  • Track circuit usage (fixed block)
  • Train control - wired (variable balise)

KTCS-2 (Pilot Line)

  • Track circuit usage (fixed block)
  • Train control - wireless (LTE-R)

KTCS-3 (Research Project)

  • No track circuit (moving block)
  • Train control - wireless (LTE-R)